Design Features
⑴. Integral Fittings are made by high-strength alloy steel characterized by high pressure bearing and long life
⑵. After heat treatment hardening and tempering, it shows good surface gloss;
⑶. Thread is made by imported tooling, thus it has good sealing;
⑷. The terminal end is connected by union, which ensures convenient and fast use.
⑶. Thread is made by imported tooling, thus it has good sealing;
⑷. The terminal end is connected by union, which ensures convenient and fast use.
Precautions
⑴. Integral Fittings must confirm the rated working pressure for the specifications on the nameplate from the front, allowing the use of the temperature range.
⑵. The operator shall take into account the drilling or production operations will feel the temperature of the device, select the appropriate temperature, and the choice of the allowable temperature compatible Integral fittings.
⑶. Integral Fittings have to undergo rigorous hydrostatic testing and non-destructive testing in the factory. Disassemble or repair, you must be hydrostatically tested. Rated working pressure test pressure regulator 10 minutes, without leakage (Note: pressure test should be drained before the air in the system).
⑷. Integral Fittings should be regularly using ultrasonic thickness measurement of wall thickness, it is recommended once a month, if not reach the effective thickness value should be replaced immediately. Replacement should be performed in conjunction with other pipelines.
⑸. Integral Fittings can not be immersed in water or underwater work; you can not bear the axial load at work.
⑹. The installation, the operator should wear protective goggles to prevent the installation process has small fragments flying eye injury.
⑵. The operator shall take into account the drilling or production operations will feel the temperature of the device, select the appropriate temperature, and the choice of the allowable temperature compatible Integral fittings.
⑶. Integral Fittings have to undergo rigorous hydrostatic testing and non-destructive testing in the factory. Disassemble or repair, you must be hydrostatically tested. Rated working pressure test pressure regulator 10 minutes, without leakage (Note: pressure test should be drained before the air in the system).
⑷. Integral Fittings should be regularly using ultrasonic thickness measurement of wall thickness, it is recommended once a month, if not reach the effective thickness value should be replaced immediately. Replacement should be performed in conjunction with other pipelines.
⑸. Integral Fittings can not be immersed in water or underwater work; you can not bear the axial load at work.
⑹. The installation, the operator should wear protective goggles to prevent the installation process has small fragments flying eye injury.
没有评论:
发表评论